Part Number: 9ZP3K / Vendor ID #: 75
Pre-Bent S Curve MonoRail
$357.50
Availability
  • Manufacturer availability unknown.
Dimensions
Height: 0.60"
Width: 0.30"
Finish: Antique Bronze
Item Color 1: Brown
Master Color: Brown
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Standard Information
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze
Style:
Contemporary
Option:
Title 20
Refinement Options
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
To: From: Subject:

Lighting Plus

Since 1987

Lighting Plus has been a Houston favorite since 1987. We carry the widest selection of major brands in residential lighting and ceiling fans in the Gulf Coast area. Visit our spacious Southwest Houston showroom and you will undoubtedly find what you're looking for among the finest names in decorative lighting in the industry.

Contact Us

LightingPlus
3627 Fondren Rd.
Houston, TX 77063

Store Hours

M-F:10am - 6pm
Sat: 10am- 6pm
Sun: Closed
© 2025 LightingPlus. All rights reserved.